top of page
shop3.jpg

02

Huerfano County Courthouse

• New Courthouse

• 110 Tons of Structural Steel

• 2 Stairwells

• Designed to Architecturally fit in with Surrounding Historical Buildings

• Required Precast Stone Support Steel on the Cornices and Capstones around the Exterior Parapet

• Main Stairwell had a 3/4" x 4" Flat Bar Railing with Cable Inserts and Wood Treads

• Secure Mason and Structural Steel Tunnel from Courthouse to Jail for Transfer of Inmates

Owner - Huerfano County

General Contractor - GH Phipps

Architect - JVA Incorporated / Anderson Halla Architects, PC

03

Janitell Storage Building

• 4-Story Building. 

• 720,000LBS of Structural Steel

• 130,900SF of Seck

• 1 Basement Level

• 3 Above-Ground Levels 

• Two 4-Story Stairwells with an Additional Roof-Level Stair Tower 

Owner - Public Storage

General Contractor - GYS General Contracting

Architect -

04

Stanley Market Place

• 150,000SF Retail & Conference Center

• Addition to a Historical Building

• One-half Mile of Guardrail Stairs & Structural Reinforcement to Existing Structure

• Over 600,000LBS of New Structural Steel

Owner -

General Contractor - White Construction

Architect - Workshop 8 and Studio NYL

05

Willow Bend Elementary School

• 3-Level Structural Steel School

• 126,000SF of Decking

• 1400 Joists

• 255 Tons of Structural Steel

• 2-Story School

• Misc. Guardrails and Stairs

Owner - 27J Schools

General Contractor - JHL Contractors

Architect - Hord / Coplan / Macht INC

06

Soaring Eagles Middle School

• New 2-Story Middle School Expansion Project

• 103 Tons of Structural Steel

• 30,000SF of Decking

• 200 New Joists

Owner - Harrison School District 2

General Contractor - Bryan Construction

Architect - CSNA Architects

Structural Steel Projects

Structural Steel Buildings from our company are of the highest quality, making them extremely durable and versatile. They are perfect for any kind of commercial or industrial use, and can be customized to fit your every need. Our Structural Steel Buildings are designed to last for generations, offering you a reliable and cost-effective solution.

01

Mrachek Middle School - Aurora

• Two-story middle school

• Six wings

• Over one million pounds of structural steel

• Over 130,000 square feet of interior space

Owner - Aurora Public Schools

General Contractor - JHL Construction

Architect - Hord Coplan Macht / RB+B Architechts

© 2023 by Allen Builders, LLC.

Designed and built by The Design Burro, LLC.

bottom of page